Procedure finder
Public procurement standstill deadline guide
A procurement challenge can turn on the authority’s notice, the mandatory standstill and an automatic suspension. The guide identifies the cited period but does not generate a date until the working-day model is independently reviewed.
Choose a deadline checkRules reviewed 7 August 2026
Choose the procedure first
A cited route for the step in front of you
These are focused procedural checks, not a general legal guide. Open the named step to see its trigger, period, counting method and the boundary that still needs to be checked.
Deadline checks
Pick the exact event or document
A calculator opens with the matching rule or system selected. A cited source guide stays deliberately source-first when the current model cannot faithfully generate a date.
Check before use
The procedure is not the whole matter
- The precise remedy, notice and court timetable must be checked separately.
- This guide does not determine whether a procurement claim is in time.
Continue checking
Related procedure finders
Construction adjudicationCalculate the cited construction adjudication referral timing and inspect the statutory or contractual source behind the date.CPR civil procedureFind a cited CPR deadline calculator for claim service, acknowledgment, defence, Part 36, directions, costs and civil appeals.Popular England & Wales deadlinesStart with the most frequently checked cited procedural deadlines in England and Wales, from service and defence to tribunal and statutory routes.