When is the deadline for request to the proper officer to appoint from the panel?
The catalogue records a 5 working-days period from The end of the 5 working day period in reg 6(2). This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 5 working-days
- Trigger
- The end of the 5 working day period in reg 6(2)
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- No express extension power and no stated sanction for either limb. In practice slippage is absorbed into the 12-week reg 9(1)(d) deadline, which does not move; if it is breached the applicant's remedy is a section 204(1)(b) appeal against the original decision, not enforcement of this step.
- Two different clocks in one sub-paragraph, and they count differently. The authority's 5 days are working days as defined in reg 6(7); the proper officer's 7 days are expressed simply as "seven days" and so are calendar days. A calculator must not apply the working-day rule to the second limb.