When is the deadline for production of subpoenaed documents to the registry instead of attending?
The catalogue records a 2 days period from the date stated in the subpoena for attendance and production (counting backwards). This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 2 days
- Trigger
- the date stated in the subpoena for attendance and production (counting backwards)
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- Because the period is 5 days or less, Court Procedures Rules 2006 (ACT) r 6350 (2) excludes every day the registry is closed. Corrected on verification: the researched quotation stopped at "attendance and production" and omitted the closing words of r 6606 (4) (b). Rule 6603A allows the issuing party to give the addressee notice of a later date or time for attendance or production, and where that notice is given the subpoena applies as if that later date were the date stated in it (r 6603A (2)), which moves this deadline.