Skip to main content

When is the deadline for application for rehearing on the ground of a fundamental procedural defect?

The catalogue records a 2 months period from Discovery of the fundamental defect or service of the final decision, whichever is the later. This draft page remains free only until its source, worked example and limits are reviewed.

Source link required
This page is in preparation. It does not offer an automated deadline or a paid record until the missing source or calculator evidence is complete.

In preparation

The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.

Example pending review

A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.

Calculation basis and source

Period
2 months
Trigger
Discovery of the fundamental defect or service of the final decision, whichever is the later
Counting
The encoded calculator method must be independently documented before publication.
Rollovers and holidays
Holiday, closure and order treatment must be independently documented before publication.

This route remains in preparation until a pinpoint official source is recorded.

  • Later-of trigger, so an engine must take max(discovery date, service date) and add two months. Subject to the ten-year long stop in Rule 245.2(c). Corrected on verification: Fetched Rule 245 from the consolidated RoP PDF (p.97). Trigger (later of discovery of the defect and service of the final decision), two months and countType months are all correct, and the entry rightly ca

Cookie preferences

Deadline Engine uses necessary cookies for authentication and security. You can choose whether we may load Plausible Analytics to measure aggregate site use. We do not use advertising or marketing tracking. You can change this any time from the footer. Read the Cookie Policy.