When is the deadline for overriding 15-year long-stop for latent injury and damage claims?
The catalogue records a 180 months period from The starting date, being the date (or last of the dates) of the act or omission alleged to constitute negligence, nuisance or breach of duty to which the injury or damage is attributable. This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 180 months
- Trigger
- The starting date, being the date (or last of the dates) of the act or omission alleged to constitute negligence, nuisance or breach of duty to which the injury or damage is attributable
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- This section bars the right of action even if the cause of action has not yet accrued before the end of the period: section 24B(3).