When is the deadline for riddor reports for mines and quarries?
The catalogue records a 7 days period from The reportable incident at a mine or quarry. This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 7 days
- Trigger
- The reportable incident at a mine or quarry
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- None.
- Confidence is medium because the retrieved text of para 4 was only partially verbatim: the quoted fragment covering the 7-day and 10-day limbs is exact, but the opening words of the paragraph and the sub-paragraph lettering were returned in summarised form. VERIFY the full paragraph numbering against the source before publishing this entry. Two separate deadlines run in paralle