When is the deadline for notification of licensable work with asbestos?
The catalogue records a 14 days period from The date on which the licensable work with asbestos is to be undertaken. This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 14 days
- Trigger
- The date on which the licensable work with asbestos is to be undertaken
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- The regulation itself builds in a discretion: the enforcing authority may agree 'such shorter time before'. In practice HSE will agree a shorter period for genuinely urgent or emergency remedial work, but agreement must be obtained in advance and cannot be assumed.
- COUNTS BACKWARD from the intended start of work, which makes it different in kind from the reporting deadlines. Confidence is medium because the retrieved text was returned partly in summary form: VERIFY the full wording and paragraph structure of reg 9(1) before publishing. The notification must include the particulars specified in Schedule 1 to the Regulations, and any materi