When is the deadline for challenge a refusal of permission made without a hearing?
The catalogue records a 21 days period from Date on which the order refusing permission, made without a hearing, was served under rule 8.5. This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 21 days
- Trigger
- Date on which the order refusing permission, made without a hearing, was served under rule 8.5
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- Rule 13.4(3)(a) itself allows the court to direct another period, and rule 3.1(2)(a) permits extension after expiry.
- Confidence is medium because rule 8.6 signposts rule 13.4 in a bracketed note rather than importing the 21 day period expressly; the 21 days is taken from rule 13.4(3)(a) applied to a permission order made without a hearing. The routes fork sharply and the engine must branch: permission refused WITHOUT a hearing goes to reconsideration under rule 13.4 within 21 days; permission