When is the deadline for filing certificate of service and statement of amount due?
The catalogue records a 28 days period from Date of the interim charging order. This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 28 days
- Trigger
- Date of the interim charging order
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- Same CPR 73.7(3) paper extension route as the 21 day service deadline, and the same CPR 73.10(6B) unless order backstop if missed without an extension. Note CPR 73.10(6B) also bites where an extension was granted but the extended time limit was then missed.
- Borderline binding call, see coverage notes. This is the single most commonly missed date in volume charging order work, because the 28 days runs from the order date, not from service, so a late-served order leaves very little margin. Diarise both 73.7(1) and 73.7(2) from the same anchor.