Skip to main content

When is the deadline for notice to municipality of a highway or bridge non-repair claim - ten days?

The catalogue records a 10 days period from The occurrence of the injury. This draft page remains free only until its source, worked example and limits are reviewed.

Source link required
This page is in preparation. It does not offer an automated deadline or a paid record until the missing source or calculator evidence is complete.

In preparation

The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.

Example pending review

A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.

Calculation basis and source

Period
10 days
Trigger
The occurrence of the injury
Counting
The encoded calculator method must be independently documented before publication.
Rollovers and holidays
Holiday, closure and order treatment must be independently documented before publication.

This route remains in preparation until a pinpoint official source is recorded.

  • STATUTORY RELIEF EXISTS AND IS SUBSTANTIAL. s 44(12): failure to give notice or insufficiency of the notice is not a bar to the action if a judge finds that there is reasonable excuse for the want or the insufficiency of the notice AND that the municipality is not prejudiced in its defence. s 44(11): failure to give notice is not a bar in the case of the death of the injured person as a result of the injury. There is no power to extend the ten days prospectively - relief is retrospective and conditional.
  • Runs from the OCCURRENCE, not from discovery. Ten days exceeds seven, so no short-period holiday exclusion arises; and in any event r 3.01 does not govern a statutory notice period - Legislation Act, 2006, s 89 does, and its s 88(2) holiday list excludes Saturday and the Civic Holiday. The notice content requirement (date, time and location) is itself mandatory. Note the separate substantive defences in s 44(3) and the gross negligence threshold for snow and ice on sidewalks in s 44(9). The City of Toronto Act, 2006 contains a parallel provision that must be checked for claims against Toronto.

Cookie preferences

Deadline Engine uses necessary cookies for authentication and security. You can choose whether we may load Plausible Analytics to measure aggregate site use. We do not use advertising or marketing tracking. You can change this any time from the footer. Read the Cookie Policy.