When is the deadline for extension of the limitation period where crown notice straddles its expiry?
The catalogue records a 7 days period from End of the two-month notice period under s 15(1), where the notice was served before expiry of the limitation period and the two-month period ends after that expiry. This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 7 days
- Trigger
- End of the two-month notice period under s 15(1), where the notice was served before expiry of the limitation period and the two-month period ends after that expiry
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- None; the extension is automatic and statutory. It cannot be enlarged.
- A NARROW SEVEN-DAY WINDOW AND NOTHING MORE. Added by Limitation of Actions Act, SNB 2009, c L-8.5, s 37.1. Both statutory conditions must be satisfied: the notice must have been served BEFORE the limitation period expired, and the two-month notice period must end AFTER that expiry. If notice is served after expiry, this subsection gives nothing.