When is the deadline for pretrial or r 4.10 conference before a streamlined trial?
The catalogue records a 3 months period from Scheduled streamlined trial date. This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 3 months
- Trigger
- Scheduled streamlined trial date
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- Rule 13.5(1) and (2), and the terms of the streamlined trial order or any procedural order, which take precedence under the opening words of r 8.29(1).
- Added by AR 126/2023 with the streamlined trial regime that replaced summary trials. Counted backward under r 13.4(1).