When is the deadline for notice to a municipality of a claim for failure to keep a road or public place in repair?
The catalogue records a 30 days period from Date of the occurrence of the event that gives rise to the action. This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 30 days
- Trigger
- Date of the occurrence of the event that gives rise to the action
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- Section 532(10) supplies the same three statutory escapes as s 531(3). Never assume one applies.
- ADDED ON VERIFICATION: missing from the researched catalogue. DIFFERENT PERIOD FROM THE SNOW AND ICE NOTICE: 30 days here under s 532(9) against 21 days under s 531(2), and the two sections cover different failures on the same physical road. Characterise the claim before choosing the period, and where both might apply give notice within 21 days. Runs from the occurrence of the event, not from discovery. Counting under Interpretation Act s 22(4). Verified against the Alberta King's Printer office consolidation of RSA 2000 c M-26 current as of 14 May 2026.