When is the deadline for maia: window to bring proceedings after the limitation period has ended?
The catalogue records a 6 months period from The giving of the notice of claim, or the grant of leave to bring the proceeding. This draft page remains free only until its source, worked example and limits are reviewed.
In preparation
The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.
Example pending review
A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.
Calculation basis and source
- Period
- 6 months
- Trigger
- The giving of the notice of claim, or the grant of leave to bring the proceeding
- Counting
- The encoded calculator method must be independently documented before publication.
- Rollovers and holidays
- Holiday, closure and order treatment must be independently documented before publication.
This route remains in preparation until a pinpoint official source is recorded.
- Express: a longer period may be allowed by the court (s 57(2)(b)).
- Operates only where the notice of claim or application for leave was made before the end of the limitation period (s 57(1)). A practical safety valve: if during the last 14 days of the limitation period the claimant is unsure which insurer to notify, notice is validly given if given to the commission (s 57(3)).