Skip to main content

Popular deadline checks

Popular Australian deadline calculators

Start with the Fair Work application or court system that applies. Each result identifies its source and factual boundary before you enter a date.

Choose a deadline checkHub sources reviewed 7 August 2026. Each rule shows its own date.

Worked check

One tested route from this procedure

Example input
03/08/2026
Relevant fact
The dismissal took effect in New South Wales on Monday 3 August 2026.
Expected result
Monday 24 August 2026 at 11.59 pm

The calculator excludes the dismissal day and counts 21 calendar days. The selected place and confirmed holiday calendar determine any final-day rollover.

Choose the procedure first

A cited route for the step in front of you

These are focused procedural checks, not a general legal guide. Open the named step to see its trigger, period, counting method and the boundary that still needs to be checked.

Check before use

The procedure is not the whole matter

  • Court-set, judge-specific and local registry dates need a separate check.
  • The calculator does not infer an extension or an alternative statutory route.

Cookie preferences

Deadline Engine uses necessary cookies for authentication and security. You can choose whether we may load Plausible Analytics to measure aggregate site use. We do not use advertising or marketing tracking. You can change this any time from the footer. Read the Cookie Policy.