When is the deadline for proceedings for breach of statutory warranty: defect other than a major defect?

The catalogue records a 2 years period from Completion of the residential building work to which the warranty relates. This draft page remains free only until its source, worked example and limits are reviewed.

Source link required
This page is in preparation. It does not offer an automated deadline or a paid record until the missing source or calculator evidence is complete.

In preparation

The existing catalogue does not yet have a registered adapter or source evidence for this exact question. It remains available as a public preparation page only.

Example pending review

A separately reviewed fixture is required before this question can become indexable. The page does not present an unreviewed output as an example.

Calculation basis and source

Period
2 years
Trigger
Completion of the residential building work to which the warranty relates
Counting
The encoded calculator method must be independently documented before publication.
Rollovers and holidays
Holiday, closure and order treatment must be independently documented before publication.

This route remains in preparation until a pinpoint official source is recorded.

  • s 18E(1)(e): if the breach becomes apparent within the last 6 months of the warranty period, proceedings may be commenced within a further 6 months after the end of the warranty period. s 18E(1A): where a building bond has been lodged for the work under Pt 11 of the Strata Schemes Management Act 2015, the 2 year period is extended until the end of 90 days after the end of the period within which a final inspection report on the building work under that Part is required. s 18E(1B) preserves any other law permitting extension. Not computed.
  • The 2 year period is the default and is easily missed. Classification of the defect as major or non-major is the decisive question, and both periods live in the same subparagraph, s 18E(1)(b). Corrected on verification: the researched entry omitted the s 18E(1A) building bond extension, which can materially lengthen the 2 year period in strata work. Section text verified verbatim against the current consolidation on legislation.nsw.gov.au.